Carroll County Public Network Upgrade
CMC asked for about $60,000 to produce a substance-use-awareness series and roughly $51,000 a year to maintain county fiber connections to town halls, as cable franchise fees — its main funding — keep falling.
Water and Sewer Capacity Limits on Development
The FY25 report shows 2,129 residential permits over six years, far below the 6,000 cap. School adequacy numbers improved after enrollment came in lower than projected, but fire and EMS data outside Westminster and Sykesville still shows challenges as the county transitions from volunteer to career staffing.
Fairhaven Well Radionuclide Contamination
Neighbors on Pars Ridge draw from a shallow aquifer already in multi-year rainfall deficit; they worry six more homes drawing water and putting septic effluent into the ground could contaminate or strain wells.
Floodplain Management Code Amendments
New FEMA flood maps take effect Nov. 27, 2026, and the county must update its floodplain codes to stay in the National Flood Insurance Program. Only five structures — including one county pump station — get newly mapped in, but the new floodway designations along the Patapsco bar any construction there.
Well Water and Groundwater in the Woodbine Area
The community relies entirely on private wells amid a county-wide voluntary water restriction and multi-year drought. Neighbors say a 150-dog kennel could use well over 2,000 gallons a day, straining fractured-rock aquifers, and worry about waste runoff feeding toward the Gillis Falls watershed and Chesapeake Bay.
Piney Run Dam Reconstruction
The county was scheduled to consider a $1.3 million engineering design and permitting contract for rebuilding Piney Run Dam, partially funded by the USDA. The dam's condition affects safety and recreation at Piney Run Park.
Freedom District Water System Repairs
One of three raw water intake pumps at the Freedom District plant failed, and the Board approved a $50,000 emergency-style replacement involving commercial divers to keep the water system reliable.
Water Resources Element adoption
A countywide look at drinking water, wastewater, and stormwater capacity is headed to public hearing. It will show where future growth could strain water resources and what infrastructure might be needed.
Liberty Water Storage Tank Booster Pump Station Project
The county hired an inspection firm for the Liberty Water Storage Tank Booster Pump Station project, a utility investment in District 5's water infrastructure.