Top issues during term (20)(Roads)
Davis Road safety, width, and school bus access
Testimony suggested emergency response times could degrade and road maintenance costs could rise under heavy commercial traffic.
Bridge Repair Services
Estimated $128,271 county share of $641,356 in design costs, 80% federally aided.
Route 26 corridor neglect and traffic safety
About six-tenths of a mile of sidewalk would connect existing segments on MD 26, per one resident's calculations; funding source unaddressed.
Old Baltimore Road closure and Chick-fil-A traffic
Not specified in the hearing; the site's commercial value could hinge on the road connection remaining open.
TrailBlazer Transit Route Changes
Route expenses stay roughly flat since the new route covers similar distance.
Freedom-area roadway planning study
$172,185 total, $48,000 covered by a federal-planning grant.
Road repair asphalt purchases
Up to $419,000 in FY27 road materials spending.
Traffic safety on Route 27 near Westview Road
Three-way stop safety at Liberty Road and Exchange Drive
Potential costs for rumble strips, signage, or signal upgrades would fall on the county, the state, or the private road owner depending on jurisdiction.
Traffic and road safety on Long Meadow Drive
Traffic mitigation for the broader Beatty property is required with the corporate park phase, but no signal at Long Meadow/Route 26 was offered.
Five-year transit plan
Transit operating costs are projected to rise from about $3.4 million to nearly $5 million a year by 2031.
Reidenour Way planned major street
A $590,000 county purchase from the FY27 budget.
Eldersburg road right-of-way acquisition
Details of the potential land offers were discussed in closed session and are not public.
Market Street Extended Project
Transit Bus Replacement Grant
Local match of $34,592, below the amount already budgeted for bus purchases.
Countywide road paving and preservation program
About $320,000 total across the three purchases, all within the approved FY26 budget.
FY28-33 capital projects and Freedom-area traffic
The projects would be county-funded, with some developer contributions already secured for Ridenour Way.
Finksburg bicycle and pedestrian facilities
$100,000 in grant funding with zero county match.
Use-in-common driveway standards
Senior and disabled transit services
Funded through FTA and MTA grants, fares and county funding; FY27 county share not stated.
Decisions during term (1)
Recorded while III was in office — not necessarily decisions they moved, spoke to, or voted on.
Voting record (0)(Roads)
No votes found matching Roads.